Notes:
7/18/2025 11:47:46 AM
8/27/2025 8:50:43 AM
This permit is approved for footing and foundation work only at this time. Once all outstanding documentation is submitted and the full permit is approved, all required inspections will be added accordingly.
12/3/2025 9:53:25 AM
The newly revised drawings have been reviewed and accepted. They’ve been uploaded to the permit.
The only remaining items are the truss drawings and layout plans. These won’t hold up the framing work at this point, but we will need them submitted before the framing inspection can be scheduled.
1/20/2026 4:16:04 PM
All require inspections have been added to the permit.