PERMIT NO:  BCOM2024-0213
ON-LINE PERMIT
   CITY OF BISMARCK
   221 N. 5th Street, North Dakota 58501

INSPECTION REQUEST LINE
SCHEDULE EXISTING INSPECTION
ON-LINE
https://trakitapi.bismarcknd.gov/etrakit/
PERMIT TYPE
BUILDING COMMERCIAL

PERMIT SUB-TYPE
NEW CONSTRUCTION

JOB VALUE
108250

APN
1175-002-100

DESCRIPTION
COLD STORAGE BUILDING- FIRE STATION 4
APPLIED DATE
8/5/2024

APPROVED DATE
8/21/2024

ISSUED DATE
8/21/2024

PERMIT STATUS
FINALED WITH CO
 
Seal
   
 
    PERMIT INFORMATION
FEE SUMMARY
    SITE 4103 MIRIAM AVE
BISMARCK, ND 58501

    APPLICANT DAKOTA WEST CONTRACTING
1116 S 23rd St
Bismarck ND 58504

    OWNER BISMARCK, CITY OF (FIRE)
PO BOX 5503
BISMARCK ND 585065503

    CONTRACTOR DAKOTA WEST CONTRACTING
1116 S 23rd St
Bismarck ND 58504
BUILDING DIVISIONBILL ME$784.86
PUBLIC WORKS WATER METER$0.00
Total Fees Collected:$784.86

FEE DISCLOSURE
Permit work can begin once fees have been paid or opted to be billed and invoiced. Invoices will be mailed and can be paid in the Fiscal Services Division. Water meters will not be issued until the invoice is paid in full and can be picked up at Public Works, 601 South 26th Street, Bismarck
NOTE for Building Inspections Permit: Work under this permit must commence within 180 days of permit issuance. Permittee must comply with all codes and ordinances applicable to work. Issuance of the permit does not grant any authorities to erect, modify, or use any structure in violation of any code or ordinance. All required inspections, including a final inspection, must be requested by the Permittee. In consideration for connection to City utilities, Permittee agrees to pay all applicable utility fees and charges pursuant to City Ordinance. This permit creates no warranties with regard to construction or code compliance. The inspections under this permit are for the benefit of the public and not the Permittee and the inspections do not create a duty to the Permittee, this owner, or to a subsequent purchaser with regard to quality of construction or code compliance. Federal law may require this construction project to conform to the Americans with Disabilities Act Accessibility Guidelines for Building and Facilities. NOTE for Fire requirements: Any additional requirements as specified during the plan review must be complied with. Any additional inspections or testing that is required shall be the responsibility of the contractor.
DEPARTMENT CONTACT INFORMATION
BUILDING INSPECTIONS: (701) 355-1465
ENGINEERING: (701) 355-1505
FIRE DEPARTMENT: (701) 355-1400
FISCAL SERVICES: (701) 355-1615
PUBLIC WORKS: (701) 355-1700, Option 1
STORM WATER: (701) 355-1740
INSPECTION SUMMARY

______  BUILDING FOUNDATION
______  BUILDING FRAMING
______  BUILDING FRAMING
______  STORMWATER BUILDING FINAL
______  FIRE BUILDING FINAL
______  FORESTRY BUILDING FINAL
______  BUILDING FINAL**
______  ASSESSING FINAL
______  BUILDING FINAL**
______  FIRE BUILDING FINAL
______  BUILDING FINAL**
Permit Finaled Date:  __________    Inspector Name:  __________________    Signature:  __________________