Notes:
6/11/2026 1:16:33 PM
6/24/2026 6:19:45 PM
Permit is approved for footing and foundation only. The required inspections for the framing, thermal, Fire rating, and final inspections will be added to the permit when the required information for the truss plans and drawings are submitted.