Notes:
9/21/2026 10:37:15 AM
9/24/2026 9:01:54 AM
- FRONT COVERED DECK, NO REAR DECK
- Please email a copy of the final, engineered and stamped, floor and roof truss drawings and layouts to us when you get them. This can be a deferred submittal item and is not required for the approval of the building permit.
- Please schedule a deck framing inspection when ready and prior to installing the deck boards.