Notes:
9/15/2025 4:04:59 PM
- Please email a copy of the final, engineered and stamped, floor and roof truss drawings and layouts to us when you get them. This can be a deferred submittal item and is not required for the approval of the building permit.
- Please schedule a deck framing inspection when ready and prior to installing the deck boards.