Notes:
9/12/2025 2:35:39 PM
- Please email a copy of the final, engineered and stamped, roof truss drawings and layout to us when you get them. This can be a deferred submittal item and is not required for the approval of the building permit.
REQUIRED INSPECTIONS:
1) ACCESSORY FOOTING
2) ACCESSORY FRAMING
3) ACCESSORY FINAL