Notes:
8/15/2025 7:49:03 AM
......... REMODEL MASTER BATH.
REQUIRED INSPECTIONS: 1. FOOTING, 2. FOUNDATION, 3. DRAIN TILE, 4. FRAMING, 5. THERMAL ENVELOPE, 6. FINAL
- Please email a copy of the final, engineered and stamped, floor and roof truss drawings and layouts to us when you get them. This can be a deferred submittal item and is not required for the approval of the building permit.