Notes:
7/8/2025 11:29:23 AM
... 1 STORY
- Please email a copy of the final, engineered and stamped, floor and roof truss drawings and layouts to us when you get them. This can be a deferred submittal item and is not required for the approval of the building permit.
- Please schedule a deck framing inspection when ready and prior to installing the deck boards.