Notes:
4/21/2023 12:48:28 PM
- PLEASE LEAVE A COPY OF THE ENGINEERED (STAMPED) FLOOR / ROOF TRUSS DRAWINGS AND LAYOUTS AT THE JOBSITE, UPLOAD TO ETRAKIT, OR EMAIL THEM TO US WHEN YOU GET THEM.
4/21/2023 12:49:31 PM
REQUIRED INSPECTIONS: 1. FOOTING, 2. FOUNDATION, 3. DRAIN TILE, 4. FRAMING, 5. THERMAL ENVELOPE, 6. FINAL